-- card: 40630 from stack: in -- bmap block id: 40785 -- flags: 0000 -- background id: 3633 -- name: Slack Time -- part 42 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=129 right=144 bottom=223 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part 44 (button) -- low flags: 00 -- high flags: A003 -- rect: left=245 top=186 right=206 bottom=441 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Slack Time and Critical Path ----- HyperTalk script ----- on mouseUp go card id 97045 end mouseUp -- part contents for background part 6 ----- text ----- Slack time is the amount of time that a task can slip without delaying the rest of the project. It is extra time allowed for a task after the task’s planned or projected finish. MacProject II displays slack time associated with tasks in the Task Timeline and Resource Timeline as a shaded extension to a bar (added on after the elapsed time). -- part contents for background part 7 ----- text ----- Slack time appears in the Project Table, and you can display it as one of the attributes in the Schedule Chart. Resources can also have slack time associated with their assigned work on a task. -- part contents for background part 27 ----- text ----- Schedule Information -- part contents for background part 28 ----- text ----- Slack Time -- part contents for card part 42 ----- text ----- Scheduled time       Slack time